Riverbend Mixed-Use — Tower B · prepared for for court / counsel.
Simulated data. Every capture in this demo is
origin: "simulated" — invented, not recorded on a jobsite. These
pages show how a productivity factor is derived. No model-accuracy
figure is reported anywhere: simulated captures may train a model and may never
measure one, so an accuracy number computed here would be meaningless.
Traceability: All 3 figures resolve to their source capture and hours rows.
Change-order package
Riverbend Mixed-Use — Tower B · 1400 Riverbend Way, Burnaby,
BC · data region ca-central-1
Figures and their sources
Scope item
Date
Installed
Hours
Factor
Provenance
Drywall Level 4 board hang — north wing
2026-08-17
47 sheets
8
0.98On rate
Traced
captures: cap-1
hours: hrs-1
Drywall Level 5 board hang — north wing
2026-08-18
29 sheets
8
0.60Critical
Traced
captures: cap-3
hours: hrs-2
Framing Level 5 metal stud partitions
2026-08-20
210 lin ft
12
0.97On rate
Traced
captures: cap-6
hours: hrs-3
Conditions recorded on the same captures
Material staging blocking corridor at L5 north (blocked_access, capture cap-3, confidence 0.79)
Mechanical rough-in working same corridor (stacked_trades, capture cap-4, confidence 0.74)
Exhibit A — annotated capture
Real photograph, invented numbers. This capture is
origin: "simulated". It illustrates what the annotation layer
produces; no figure on it describes measured work, and none of it may support
an accuracy claim.
L4 north corridor · 2026-08-17 ·
16 board counted, 4 below threshold ·
model drywall-v0.3-demo ·
face blur declared_no_people
Deliberately excluded
1 labour-hours record(s) excluded — unmapped_cost_code:04-320. Excluded rather than joined, so no figure above rests on an unmapped cost code.
1 quantity estimate(s) abstained — the model declined to give a number. Recorded as absent, never as zero.
Standing notes
Every capture in this demo is origin: "simulated". No figure here describes real work.
No individual-worker productivity view exists in the schema, so none can appear in a report.
This document is an export for the subcontractor or their counsel. It is not a filing, and nothing was submitted to any authority.
Assistant · fills forms and explains numbers. It never sets a quantity,
an abstention, or a face-blur declaration — those stay yours.