SiteWireAiKilmer Ridge — Phase 2
Data region ca-central-1 Faces blurred at ingest

Dashboard

Choose a project, then the report for whoever is going to read it. A report only becomes available once every figure in it resolves back to a source capture and labour-hours record.

Projects

Riverbend Mixed-Use — Tower B

1400 Riverbend Way, Burnaby · BC
3 scope items 3 reconciled 6 captures
Lowest factor 0.60Critical
Select project

Kilmer Ridge — Phase 2

2200 Kilmer Road, Surrey · BC
2 scope items 2 reconciled 2 captures
Lowest factor 0.66Critical
Selected

Fraser Exchange — Podium

88 Exchange Street, New Westminster · BC
0 scope items Awaiting first capture
Select project
These are exports, not filings. A package is something a subcontractor or their counsel sends. SiteWireAi does not file to ODACC or to a BC nominating authority, and nothing here submits anything on your behalf.

Reports for Kilmer Ridge — Phase 2

For court / counsel

Change-order package

Dated, photo-backed record of installed quantity against bid rate, with the jobsite conditions found on the same captures. The everywhere-format used to support a claim.

All 2 figures resolve to their source capture and hours rows. Generate

Dispute record — full provenance

Every figure with its source capture and labour-hours row listed beside it, plus the records deliberately held back and why. Built to be handed to counsel.

All 2 figures resolve to their source capture and hours rows. Generate

For adjudication & arbitration

BC adjudication export

Prompt-payment adjudication export shaped against Ontario practice, which is the closest published specification.

Provisional. Provisional format. BC's Construction Prompt Payment Act regulations were still in consultation as of mid-2026 — no in-force date and no designated adjudication authority announced. Treat the layout as a working draft to revise once the regulations land, not a filing-ready form.
All 2 figures resolve to their source capture and hours rows. Generate

Ontario adjudication export

The same structured record laid out against Ontario adjudication practice, where the specification is published.

All 2 figures resolve to their source capture and hours rows. Generate

For the CEO / exec team

Executive ops digest

Portfolio view: which scope items are drifting, how much labour sits behind them, and what is blocked. No individual-worker breakdown exists to report.

Summary report — no per-figure traceability requirement. Generate

Everywhere else in SiteWireAi