Choose a project, then the report for whoever is going to read it. A report only becomes available once every figure in it resolves back to a source capture and labour-hours record.
Simulated data. Every capture in this demo is
origin: "simulated" — invented, not recorded on a jobsite. These
pages show how a productivity factor is derived. No model-accuracy
figure is reported anywhere: simulated captures may train a model and may never
measure one, so an accuracy number computed here would be meaningless.
These are exports, not filings. A package is something a
subcontractor or their counsel sends. SiteWireAi does not file to ODACC or to a BC
nominating authority, and nothing here submits anything on your behalf.
Reports for Fraser Exchange — Podium
For court / counsel
Change-order package
Dated, photo-backed record of installed quantity against bid rate, with the jobsite conditions found on the same captures. The everywhere-format used to support a claim.
No reconciled figures yet — this project has no captures joined to labour hours.
Not ready
Dispute record — full provenance
Every figure with its source capture and labour-hours row listed beside it, plus the records deliberately held back and why. Built to be handed to counsel.
No reconciled figures yet — this project has no captures joined to labour hours.
Not ready
For adjudication & arbitration
BC adjudication export
Prompt-payment adjudication export shaped against Ontario practice, which is the closest published specification.
Provisional. Provisional format. BC's Construction Prompt Payment Act regulations were still in consultation as of mid-2026 — no in-force date and no designated adjudication authority announced. Treat the layout as a working draft to revise once the regulations land, not a filing-ready form.
No reconciled figures yet — this project has no captures joined to labour hours.
Not ready
Ontario adjudication export
The same structured record laid out against Ontario adjudication practice, where the specification is published.
No reconciled figures yet — this project has no captures joined to labour hours.
Not ready
For the CEO / exec team
Executive ops digest
Portfolio view: which scope items are drifting, how much labour sits behind them, and what is blocked. No individual-worker breakdown exists to report.
Nothing reconciled yet, so there is nothing to summarise.
Not ready